Hi.
EXIT_SAPLKASC_002 Is trigger al the time of percentage or qty calculation. This is my costing sheet:
Some Ideas of the cause of the problem:
1. If the previous step is incorrect (base calculation), this exit is not trigger. Check the Cost Elements you are using in the base calculation are in the PP Order.
in the PP order I have the cost element 711000000
2. In the define Rates (qty or %) check the dependancies. Also check if you define a Overhead Group / Overhead Key, and also set this field in the Material Master
In my system, i have C010 with dep D010 so i need to set overhead key
You assign the overhead key to the overhead group
And the Overhead group to the Material master
Here is the CO01 PP Order creation, click the costing button (calc). The break point is trigger.
Wish this help you
Arturo.