Hello Annie,
This is a valid and possible scenario. Note with lower number can have a higher number note as pre-requisite.
- This can happen if the version of the note changes which happens when the underlying correction instruction of the note changes.
- Moreover the pre-requisite relationship depends entirely on the correction instruction rather than a note. Pre-requisites can be added at any point in time and can refer to any correction instruction of the note <higher or lower>.
This should not be problem as such during implementation of the note. In your case both the notes should get implemented by SNOTE.
In case you encounter any problem/errors, please raise an OSS message we will check out further.
Regards,
Manoj